Skip to content

Goals

Goals are the one thing Mora tracks from one 1:1 to the next. Agenda items and notes belong to the meeting they were written in. If something should still matter in a month, make it a goal.

You can add a goal from four places:

  • the Goals tab on a person’s page
  • the Goals page, for anyone on your team
  • the Open goals section in meeting mode, without leaving the 1:1
  • the wrap-up, while you’re reviewing what moved

A goal has these fields:

FieldRequiredNotes
TitleYesFor example, Get promoted to Staff Engineer
NotesNoWhat does success look like?
Target dateNoEnables the pace-based status signals
TagsNoColored labels. See below
StepsYes, at least oneThe concrete pieces of work

If you start editing a goal and close the dialog without saving, Mora asks before discarding your changes.

Progress is measured as steps completed divided by steps total, so a goal needs at least one step for Mora to show progress on it.

Tags are colored labels you put on goals, such as Growth, Delivery, or Onboarding. A goal can have more than one.

Choose them from the tag picker when you create or edit a goal. Tags are shared across your whole team, so the same tag means the same thing on everyone’s goals.

Manage the list in Settings → Goal tags. Renaming or recoloring a tag changes it everywhere it appears, and deleting one tells you how many goals use it first.

Colors come from a fixed set.

The Goals page lists every goal on your team, grouped by person, with any that need attention at the top. A panel down the side filters and sorts them:

Filter bySort by
PersonStatus, worst first
TagTarget date
StatusNewest

While a filter is active, the “needs attention” group is hidden, so you see only what you filtered for.

Closed goals are in one collapsed section at the bottom.

Select any goal to open its own page, where you can edit the title, description, and steps.

Mora works out a goal’s status each time it’s shown. You don’t set it yourself. The first matching row wins:

StatusWhen
OverdueIt has a target date and that date has passed
At riskIt has a target date and more of the time has passed than work is done, by a wide margin
StalledIt has steps, it’s more than three weeks old, and nothing has changed in three weeks
On trackEverything else

A new goal never shows a warning. “At risk” only applies after the first quarter of its timeline has passed.

If someone has goals in trouble, their card on the Team page shows how many are off track. There’s no notification and nothing to mark as read — fixing the goal clears it. What needs you

Goals can be closed in three ways:

Closed asMeans
CompletedFinished successfully
CancelledCalled off deliberately, because priorities changed
AbandonedDropped without a decision

Only active goals count as open. Recording which of the three it was is worth the extra step, because a report with three abandoned goals tells you something different from one with three completed goals.

WhereWhat you see
GoalsEvery goal on your team, filterable by person, tag, and status
A person’s Goals tabTheir goals, active and closed
Meeting modeTheir open goals, editable during the 1:1
The wrap-upThe goals you discussed in that 1:1
TeamA count per person, and how many are off track

Mora reads open goals when suggesting agenda items and writing briefings.